Six Solutions Case Study

Six Solutions Case Study

Background The Pantoro Mine Site, located in Western Australia’s Eastern Goldfields, required full internal coating removal from a 1,100 m² Carbon-in-Leach (CIL) tank. This infrastructure needed remediation of all internal surfaces, including walls, floor, baffles,...
Cappellotto Equipment Refurbishment

Cappellotto Equipment Refurbishment

If you operate Cappellotto vacuum & hydro excavation units that are experiencing reduced   suction or jetting performance, reliability issues, or general wear and tear over many years,  there’s an alternative to full replacement. Refurbishment, when executed with...
Yarra Trams Case Study

Yarra Trams Case Study

Background Yarra Trams operate Melbourne’s extensive tram network – the largest urban tram system in the world – covering 250 kilometres of double track across 24 routes, with a fleet of almost 500 trams. To keep more than 5,000 services a day running...